Video wall commissioning: the 18 checks we sign off before handover

Handover is not when the picture appears. It is when every input, every preset and every failure mode has been tested. The list we actually use.

All insights →

Signal and mapping

  • Every input tested at its native resolution, one at a time.
  • Source-to-panel mapping verified by showing a numbered grid.
  • Overscan and underscan checked on each input.
  • All presets saved and recalled successfully.
  • Backup of the processor configuration exported to USB.

Picture quality

  • Full white uniformity checked at 3 m and at the closest seat.
  • Grey ramp from 0 to 100 percent, looking for banding.
  • Colour bars on every panel, checking for a swapped cable.
  • Brightness measured at centre and corners with a meter.
  • Seam gaps measured at three heights on every vertical joint.

Audio and control

  • Audio embedded and de-embedded correctly, no lip sync error.
  • Control system can power on, power off, and select sources.
  • Emergency input or blank screen function tested.

Failure modes

  • Pull one source cable, confirm the wall shows the expected message rather than a frozen frame.
  • Power cycle the processor, confirm it returns to the last state.
  • Simulate a single receiving card failure, confirm the rest of the wall keeps running.
  • Check that the bypass or fallback content plays.

Documentation

  • As-built drawing with cable IDs.
  • Processor configuration file and IP schedule.
  • Spare parts list with locations.
  • Two-hour operator training, signed attendance.

Why the failure-mode checks matter most

The picture working on handover day is the minimum. What the client remembers is what happened the first time something failed. A wall that shows a clear message and keeps the rest running is a wall they trust. A wall that freezes and needs a site visit is a wall they regret.

Related products

Let’s find the display your project needs.

Discuss your project ↗

Language